Francisco BolimaCADD Manager/Technician

Francisco has 5 years of AutoCAD drafting experience. He is multi-disciplined, providing CADD drafting services for excavation, bored tunnels, structural, civil, track, and maintenance of traffic drawings. He also has file management skills that includes ERoom, and Adept. Francisco has experi-ence in script writing, and customizing AutoCAD.

Education

North Seattle Community College (2005)

CADD drafting course of study

Additional Coursework

N/A

Employment History

Years with BD&D - 5

Years of Experience - 5

Relevant Experience

Sound Transit East Link Phase 3/CH2M Hill Team

BD&D is providing CADD services for the preliminary engineering phase (Phase 3) of the East Link project. Francisco is assisting in preparing CADD drawings for the light rail alignment and related stations. In addition to working with engineers to produce CADD drawings, Francisco is responsible for the management of the electronic files for the project using Sharepoint. He is also the Sharepoint instructor, training team members in the use of the program. When needed, Francisco assumes the duties of the CADD manager. His duties also include package assembly and assistance with QA/QC review.

Sound Transit East Link Phase 2/CH2M Hill Team

Francisco provided CADD support for the conceptual design of this 21-mile light rail project con-necting the downtown Seattle Central Link rail with East King County. The scope of work included plan drawings, alignment profile with two alternative routes and station location plans. In addition to providing CADD services using Sound Transit standards, Francisco's responsibilities included provid-ing technical assistance regarding file management to our CADD staff.

Sound Transit University Link/NTP Team

BD&D provided CADD services for this final design project; a 3.5 mile light rail system for the North Puget Sound corridor. The scope of work included surveying, surface and tunnel design, track alignment and design, and architectural design of rail stations. Francisco provided CADD services and produced drawings in conjunction with other team members for all segments for this light rail.

Sound Transit Central Link Light Rail/PSTC

Francisco produced drawings for this 214 mile light rail project extending from Westlake Center in downtown Seattle to Tukwila . The project features a mile long tunnel through Beacon Hill and the Westlake to International District tunnel. This line opened to the public July 2009.

.